Construction Savings

R-50: fewer materials, less handling, and increased savings

R-50 Insulation significantly reduces overall costs during construction when compared to conventional insulation materials. Here’s how:

 
 
019.jpg

Reduced need for demolition

R-50 Systems products enable retrofitted structures to achieve required R-values in less time, with fewer materials, and without costly and destructive building modifications.

 

 
DSCN9167.JPG

Reduced construction costs  

 Conventional insulation options requires up to 15” of height to reach the code-required R-50 value, making it extremely costly when retrofitting buildings.  R-50 Systems products meet or exceed those R-value requirements with a thickness of 1.5” or less.

 
DSCF0012.jpg

Easy to handle easy to transport  

 R-50 Systems products are manufactured to spec and lightweight, lowering the cost of delivery and handling and reducing labor costs by more than half – both to and on the jobsite.

 
P3250019.jpg

Reduction in replacement costs

R-50 can save your replacement costs as much a 60%.  Longer material life prolongs overalls life of the structure and extends the need for future roofing repairs.